THORPEX Pacific Asian Regional Campaign (T-PARC)

Overview | System | Campaign Diary | Gallery | Publications | Contact | Links 



Campaign diary on 21 August 2008

Things are progressing step by step. The team has set up the local operations center, obtained the first Japanese mobile phones and also a letter for leaving (and re-entering) the base. However, the attempts to leave the base and to have the first Japanese food were interfered by a heavy thunderstorm that also caused a blackout on base. The next attempt to leave the base will be made tomorrow.

The Falcon started it's transfer and moved to Moscow today.

Author: Martin W.



Copyright © 2008 by Deutsches Zentrum für Luft- und Raumfahrt (DLR). Alle Rechte vorbehalten.

Impressum / Imprint - Datenschutzerklärung / Privacy Policy